Concur. In Texas and Florida they have a permit shot clock. That is, if the City doesn't get their work done in 30 business days, the builder can hire a licensed private inspector to approve the permits instead. [The Legislature just adopted the Florida/Texas system under Bill AB 253](https://leginfo.legislature.ca.gov/faces/billNavClient.xhtml?bill_id=202520260AB253).